Barndominium Builders in Conway, SC
Conway is Horry County's seat, thirty-odd minutes inland on the Waccamaw, and it is the practical answer to a Grand Strand land search. The city holds 30,627 people across 27.995 square miles - about 1,094 to the square mile, roughly half the density of Summerville and well under Myrtle Beach's - and unlike the beach municipalities it kept genuine land districts on its own map: Residential Agricultural and Forest Agriculture both set a 40,000 square foot minimum lot with 200 feet of width, a 40-foot height limit and 50-foot front and rear yards, and single-family is a permitted use in each. Two design facts are worth having straight before anything is drawn. The Building Codes Council's Horry County sheet puts its 150 MPH contour offshore in the Atlantic where it never crosses land, and its 140 MPH contour through the western county past Aynor - so Conway sits between the two lines and there is no Conway number to look up, only a reading the authority having jurisdiction makes, and inside the city that authority is Conway rather than the county. And the seismic labels on that same sheet read B here, which means the residential code's seismic chapter never reaches a detached dwelling at all - the exact opposite of the Charleston-triangle towns an hour and a half down the coast. The engineering case in Conway is made on wind, on the water table and on what the city asks for at submittal. The city's own accessory-structure rules are the thing to read before buying, because they are stricter than unincorporated Horry's in both size and material.
Building conditions in Conway
The building code is the same in every South Carolina county: S.C. Code § 6-9-10(A) requires each municipality and county to enforce the Building Codes Council's codes and to enforce only those, and SC Regulation 8-236(C) bars a local jurisdiction from writing one of its own. The design numbers are not local either, but they are not one number for the state — Regulations 8-1202 and 8-1203 send wind and seismic to the Council's own map for this county, and those maps are drawn as contours, so the figure is read at your address rather than off a county name. What is genuinely local is who issues the permit and inspects the work, what that office charges, the permit procedure it adopted by ordinance, whether your parcel is zoned at all, and the rest of Table R301.2 — frost depth, termite probability and flood — which the jurisdiction fills in for itself.
SC Building Codes Council, Wind/Seismic Maps, https://llr.sc.gov/bcc/maps.aspx and the Horry County sheet at https://llr.sc.gov/bcc/PDFfiles/WSMaps/Horry%20County.pdf (10,372,422-byte one-page PDF whose single embedded 10,166 x 10,867-pixel raster was extracted and read at native resolution; transcription recorded in research/statewide/design-criteria-and-climate.md section 3c); Regulations 8-1202 and 8-1203, 2021 Code Modifications, S.C. State Register Vol. 46 Issue 5, 27 May 2022, https://llr.sc.gov/bcc/PDFfiles/2021-Code-Modifications.pdf ; SCBCC 2021 Modification Index, modifications IRC 2021-04 and IRC 2021-05, https://llr.sc.gov/bcc/PDFfiles/2021-Modification-index.pdf ; City of Conway Building Department, https://www.conwaysc.gov/departments/building/index.php
Seismic and wind labels from the SCBCC Horry County sheet, https://llr.sc.gov/bcc/PDFfiles/WSMaps/Horry%20County.pdf (raster extracted and read at native resolution); comparison counties from the Council's Dorchester, Berkeley and Charleston sheets linked at https://llr.sc.gov/bcc/maps.aspx ; 2021 South Carolina Residential Code sections R301.2.2, R301.2.2.6, R403.1.2, R403.1.3 and R403.1.6.1, read at https://up.codes/viewer/south_carolina/irc-2021/chapter/3/building-planning and https://up.codes/viewer/south_carolina/irc-2021/chapter/4/foundations — a third-party rendering of the adopted South Carolina code
City of Conway Unified Development Ordinance section 5.2.1(A) (Accessory Structures) and Article 4 Use Tables, adopted 12 December 2011, last amended 20 July 2026, city-published PDF at https://www.conwaysc.gov/Current%20UDO%20(7.20.26).pdf (11,450,157-byte PDF downloaded 6 Sep 2026, text extracted and read in both layout and reading order), linked from https://www.conwaysc.gov/departments/planning___development/p_dfrequently_referenced_documents.php
City of Conway Unified Development Ordinance sections 5.2.1(A)(6), 5.2.1(A)(7), 5.2.1(B)(6), 6.2.3(C) and (D) and 10.2.2, https://www.conwaysc.gov/Current%20UDO%20(7.20.26).pdf , linked from https://www.conwaysc.gov/departments/planning___development/p_dfrequently_referenced_documents.php
City of Conway Unified Development Ordinance sections 3.2.1, 3.2.2, 3.2.3, 3.2.16, 6.1.10 and 6.2, Table 6.1 (Dimensional Requirements for Residential Zoning Districts, read in both layout and reading-order extractions and reconciled), and Article 4 Use Tables, https://www.conwaysc.gov/Current%20UDO%20(7.20.26).pdf , linked from https://www.conwaysc.gov/departments/planning___development/p_dfrequently_referenced_documents.php
City of Conway Unified Development Ordinance section 5.2.1(A), https://www.conwaysc.gov/Current%20UDO%20(7.20.26).pdf ; Horry County Zoning Ordinance (Appendix B to the Code of Ordinances) sections 402 and 919 and Table 2-1, county-published edition at https://www.horrycountysc.gov/media/i0pfcm2o/appendix-b-zoning-ordinance-upated-912026.pdf ; Horry County Code Enforcement, "What you need for a Building Permit," https://www.horrycountysc.gov/departments/code-enforcement/permits/building-permit/what-you-need-for-a-building-permit/ ; City of Conway Building Department, https://www.conwaysc.gov/departments/building/index.php ; S.C. Code section 6-9-10, https://www.scstatehouse.gov/code/t06c009.php
Also worth knowing before you build in Conway
- Two feet above the base flood elevation, and three elevation certificates before you are done
- Conway sits on the Waccamaw River, and the city's floodplain rules are the practical consequence. The city's own floodplain page states the standard plainly: "The minimum elevation of a structure within the Special Flood Hazard Area is 2 feet above the Base Flood Elevation." That is a foot less freeboard than Myrtle Beach requires on the coast, and it is still a fill, drainage and driveway-grade decision on a wide slab-on-grade building rather than a detail - the flood determination belongs before the pad is designed, not after. The paperwork is the part people underestimate: "Elevation Certificates (ECERTs) will be required for new construction in the Special Flood Hazard Area. Each project will have to provide 3 Elevation Certificates; Construction Drawings, Under Construction and a Finished Construction Elevation Certificate." Three certificates means a surveyor on the job three times, at design, during construction and at completion. The Unified Development Ordinance reinforces the same two-foot standard from the land-development side: Section 10.5's lot design rules require that a lot's building area "shall lie at or be elevated to at least two (2) feet above the one hundred (100) year flood elevation as provided for in the Flood Damage Prevention Ordinance (Title 5, Chapter 2 of the City of Conway Code of Ordinances)," and that lots be designed to provide positive drainage away from building sites. Outside the Special Flood Hazard Area the city notes B, C and X zones, where the certificates are not required.
- The city's fee is worked from a fixed valuation, and a garage is valued at a sixth of a house
- Conway prices a residential permit off a valuation the city sets rather than off your contract, and the schedule is unusually explicit about it. The Construction Services Permit Fee Schedule for 2026-2027 sets residential building, for new construction and additions only, at "$200.00 per square foot valuation," and private garages at "$33.00 per square foot valuation" - so the same square foot is valued roughly six times higher as house than as garage, and the fee follows. Storage buildings are charged differently again, at "$0.30 x total square foot for permit cost," and porches and decks at $0.25 per square foot. The valuation then runs through the Permit Fee Chart: $30.00 up to $2,000; $30.00 for the first $2,000 plus $6.00 per additional thousand to $50,000; $324.00 for the first $50,000 plus $5.00 per thousand to $100,000; $574.00 for the first $100,000 plus $4.00 per thousand to $500,000; and $2,174.00 for the first $500,000 plus $3.00 per thousand above. Plan checking is one-half the permit fee. Zoning compliance is $25.00 and a contractor change is $150.00. Sanitation plan review is "$340 per unit for single-family & multi-family units." Re-inspection is $100.00 after two failed inspections, and $100 where an inspection is requested but the work is not ready. A permit renewal is half the permit fee, or $150.00 if the project has reached final inspection or certificate of occupancy. And the schedule keeps the usual penalty with unusual emphasis: where work requiring a permit "is started or in progress prior to obtaining said permit, the fees herein specified shall be DOUBLED." Trade permits - electrical, plumbing, mechanical and gas - are charged separately on their own bases.
- An accessory dwelling unit is capped at half the house or 1,000 square feet, whichever is less
- If the plan is a shop with living quarters over or beside it, the city has a specific instrument for that and a specific ceiling on it. Section 6.2.2(G) of the Unified Development Ordinance governs accessory dwelling units. Location: ADUs "shall be located in the rear yard as defined by Article 2 with the exception of being part of an attached or detached garage, which may be located in a side yard," and where in a side yard may not sit forward of the front facade of the principal structure. Height: subject to the district maximum, and "the ADU shall not exceed the height of the principal structure on the property." Number: "No more than one (1) ADU shall be permitted on a single deeded lot in conjunction with a permitted single-family detached dwelling." Size: "The size of an ADU shall not exceed 50 percent of the gross floor area of the principal dwelling or one thousand (1,000) square feet, whichever is less." It requires one additional off-street parking space, must "architecturally complement the primary structure in exterior finish and roof pitch," permits no retail sales, may be attached or detached, and the property may not be converted to a horizontal property regime. So a thousand square feet is the hard ceiling on habitable accessory space inside the city, and on a house under 2,000 square feet the ceiling is lower still. That is the honest reason the one-building design - shop bay and living space under a continuous roof, permitted and inspected as a dwelling - is the right answer more often inside Conway than the two-building one.
- 27.995 square miles, 1,094 people to it - and 151,691 acres of farmland outside
- Conway is the largest municipality by land area on the Grand Strand and the least crowded, and the numbers explain why a land search that starts at the beach ends here. The Census Bureau's 2025 Gazetteer records the city at 72,507,826 square metres of land - 27.995 square miles, about 17,917 acres - which is more territory than the City of Myrtle Beach holds at 23.441 square miles. The Vintage 2025 estimates put 30,627 people on it, roughly 1,094 to the square mile against Myrtle Beach's 1,746 and Summerville's 2,353. Then the county around it: USDA's 2022 Census of Agriculture records 629 farms working 151,691 acres in Horry County - 20.9 percent of a 725,217-acre county - of which 92,254 acres is cropland, 48,253 woodland and 5,579 pasture, at an average holding of 241 acres. The size distribution is the part that matters to a buyer: 248 of those operations run 10 to 49 acres and 178 run 50 to 179, so about two thirds sit under 180 acres. That farm belt is the county's western and northern half - Aynor, Galivants Ferry, Green Sea, Loris - and Conway is the town it drains into. Meanwhile the Census Bureau recorded 14,222 net domestic migrants into Horry County in the year to 1 July 2025, the largest single-county figure in South Carolina. Demand on the beach, land inland, and twenty to forty minutes of road between them.
- In the city you are on public utilities; outside it, soil decides the parcel
- Conway runs its own water and sewer, and inside the corporate limits that removes the single biggest variable on a rural build. Outside the line it comes straight back, and it is the thing most likely to kill a tract that otherwise looks perfect. South Carolina permits onsite wastewater under Regulation 61-56, and the regulation sets suitability from soil morphology - texture, restrictive horizons and depth to the zone of saturation - rather than from a percolation test, determined either by state staff or by a Professional Soil Classifier whose report you file with the application. Section 61-56.200.7 then requires a usable repair area of at least 50 percent of the original system on soil proven suitable, so the parcel has to hold the system, its full setback envelope and a proven reserve, none of it under the drive, the shop or the pool. The odds in this county are worth knowing before you fall in love with a tract: a query of the USDA soil survey for Horry County returns 257,920 acres rated poorly drained and 145,427 very poorly drained out of the 721,803 acres classified - 55.8 percent between them - against just 82,956 acres, 11.5 percent, rated well drained, with Johnston, Woodington, Pocomoke, Ogeechee and the Leon spodosol dominating. On that ground the winter water table sits close to the surface, and the two decisions that follow are how much fill goes under the pad and whether the septic evaluation passes at all. Note one more thing that catches edge-of-Conway buyers: the State will not issue an onsite wastewater permit where public sewer is accessible, which reaches further out from the city than people expect.
- A barndominium is never a farm structure in South Carolina
- The FA district's name invites this question and the answer is closed in the statutory definition rather than in a test, so it does not turn on how the building is used. S.C. Code section 6-9-65(A) defines a farm structure as one constructed on a farm "other than a residence or a structure attached to it, for use on the farm including, but not limited to, barns, sheds, and poultry houses." A barndominium is a residence, so it sits outside the exemption from the first day, and the shop half of a shop-house under one continuous roof sits outside it too because it is attached to a residence. There is no square-footage test and no percentage-of-use test to work with. The section closes three more gaps people try: section 6-9-65(C) makes the exemption conditional on the owner filing an affidavit with the local building official before construction, stating the purpose and intended use, so it is never automatic; the definition expressly excludes a structure "originally qualifying as a 'farm structure' but later converted to another use," which is precisely the plan of putting up a pole barn and finishing it into living space later; and section 6-9-65(B) preserves FEMA National Flood Insurance Program standards regardless, which matters on the Waccamaw. Horry County's zoning ordinance draws a parallel line from the land-use side without pretending it is a code exemption - its Section 108 lets genuinely agricultural buildings used in connection with a bona fide agricultural use be shown on a site plan without being drawn to scale, while still meeting the district's exterior setbacks. That is a drafting concession about site plans. It is not permission to live in the building.
City of Conway, Flood Plain Information, https://www.conwaysc.gov/departments/building/flood_plain_information1.php (read 6 Sep 2026); City of Conway Unified Development Ordinance section 10.5 (Lot Building Areas), https://www.conwaysc.gov/Current%20UDO%20(7.20.26).pdf ; City of Conway Code of Ordinances, Title 5 Chapter 2 (Flood Damage Prevention), https://library.municode.com/sc/conway/codes/code_of_ordinances?nodeId=TIT5PLDE_CH2FLDAPR
City of Conway, Construction Services Permit Fee Schedule 2026-2027, https://www.conwaysc.gov/Const%20Services%20Permit%20Fee%20Schedule%202026-2027..pdf (PDF downloaded and read 6 Sep 2026 in both layout and reading-order modes; the residential and commercial tables are quoted from the reading-order render, which pairs each label with its own value), linked from the City of Conway Building Department, https://www.conwaysc.gov/departments/building/index.php
City of Conway Unified Development Ordinance sections 5.2.2 and 6.2.2(G) (Accessory Dwelling Units), https://www.conwaysc.gov/Current%20UDO%20(7.20.26).pdf
U.S. Census Bureau, 2025 Gazetteer Files, Places, South Carolina, https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_gaz_place_45.txt (Conway city ALAND 72,507,826 sq m, 27.995 sq mi; Myrtle Beach city 23.441 sq mi; Summerville town 22.601 sq mi); U.S. Census Bureau, Vintage 2025 subcounty estimates, https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/cities/totals/sub-est2025_45.csv (Conway city 30,627 on 1 July 2025 against a 2020 estimates base of 25,057); U.S. Census Bureau Vintage 2025 county estimates, https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/totals/co-est2025-alldata.csv ; USDA National Agricultural Statistics Service, 2022 Census of Agriculture County Profile, Horry County, South Carolina, https://www.nass.usda.gov/Publications/AgCensus/2022/Online_Resources/County_Profiles/South_Carolina/cp45051.pdf
S.C. Regulation 61-56, Onsite Wastewater Systems, sections 61-56.102 and 61-56.200.7, https://des.sc.gov/sites/des/files/Library/Regulations/R.61-56.pdf ; SCDES Professional Soil Classifiers, https://des.sc.gov/permits-regulations/septic-tanks/professional-soil-classifiers ; USDA-NRCS Soil Data Access drainage-class aggregation for survey area SC051 (Horry County), compiled in research/statewide/soils-and-geology.md ; City of Conway Public Utilities, https://www.conwaysc.gov/departments/public_utilites_new/index.php
S.C. Code section 6-9-65, served text of Title 6 Chapter 9 read at https://www.scstatehouse.gov/code/t06c009.php ; Horry County Zoning Ordinance section 108, https://www.horrycountysc.gov/media/i0pfcm2o/appendix-b-zoning-ordinance-upated-912026.pdf
The expensive surprises are in the ground, not the building
What moves a South Carolina budget is usually below grade, and more often than not it is the drainfield rather than the foundation. R.61-56 § 200.1 settles whether a parcel can take an onsite system from soil morphology — texture, structure, depth to a restrictive horizon and depth to the zone of saturation — and § 200.2 then rules out two conditions outright: soils exhibiting massive or platy structure, and soils with substantial amounts of expansible layer clay minerals or smectites. That second clause is the one that bites on the mafic Piedmont, where the shrink-swell series sit in quantity under York, Fairfield, Chester, Laurens, Union, Newberry, Greenwood, McCormick, Lancaster, Saluda, Abbeville and Edgefield. A foundation problem has a price and an answer; an unbuildable septic parcel has neither, which is why we look at it first. Bedroom count is the number to settle early, because § 61-56.501 drives design flow from bedrooms, design flow drives trench length, and trench length plus a repair area decides how much good soil the parcel has to have — shop square footage adds nothing to it. Above the Fall Line the evaluation is done in backhoe pits rather than borings alone, so the answer comes from a dug hole and not a form. The site work, the foundation and the drainfield therefore get resolved together rather than one at a time. We price the dirt before we price the building.
What we build in Conway
All nine services are available in Conway. What a build costs depends far more on the parcel than on square footage, so we price against your land rather than publishing a rate card.
Custom Plans
Barndominium plans drawn for your parcel and sealed at the point where South Carolina’s engineering exemption stops applying.
Barndominium Kits
Engineered shell packages for South Carolina land — open construction under the state’s own definition, and therefore not a modular building.
Turnkey Builds
Barndominium construction from raw land through to occupancy: one contract, one schedule, one party answering the building official.
What a build looks like
Three stages every Conway project passes through, from a raw parcel to a finished home. Site work first, because that is where the budget is decided.
The parcel
Zoning, setbacks, flood zone and utility access get checked before anything is drawn.
Pad and permit
Clearing, grading and a compacted pad, while the submittal works through whichever office issues the permit where you are building.
Frame to finish
Shell erected and dried in, then systems, insulation and interior finish through to CO.
Those are the rules where you are building in Conway. Tell us what you want to build and we will draw it to them.
Keep reading
The questions that usually come next once you know what Conway allows.
Nearby areas we build in
Others we cover nearby. One may be a county and another a municipality inside one — and a South Carolina municipality can sit in two counties at once — so the office that issues the permit, the fees it charges, whether the land is zoned at all, and which design map covers it can all differ from one card to the next.
Building in Conway: common questions
8 questions we get asked most often about building in Conway. If yours is not on the list, ask it directly.
What design wind speed applies in Conway? I have read 150 mph for this coast.
Does the Charleston earthquake code apply to me in Conway?
Can the shop be bigger than the house inside the Conway city limits?
Can I build a metal shop inside the city?
Is there actually land inside Conway, or should I be looking outside the city?
What will the city charge me for the permit?
How high will I have to build for flood, and what paperwork does that mean?
Can I put a small apartment in the shop and live there while I build the house?
Building in Conway?
Start with the plan. Tell us what you want to build and we will draw it, then confirm which office issues the permit for your parcel, what it will let you put there, and what wind load it has to meet. That conversation costs nothing.