Barndominium Builders in Horry County, SC
If you are reading this from another state, that is the normal case here. In the year to 1 July 2025 Horry County took in 14,222 net domestic migrants — the largest single-county figure in South Carolina, more than the entire Columbia metro gained — and it is still 20.9 percent farmland, with 151,691 acres in farms across a 725,217-acre county. No other county in the State pairs that much arriving demand with that much remaining land. The land is not on the beach. Myrtle Beach city has essentially no acreage left; the parcels are inland and west, around Conway, Aynor, Galivants Ferry, Green Sea and Loris, and that is where this page is pointed. What you need to know before you buy: the entire county has been zoned since 17 April 2001, so there is a district on every parcel; the county's zoning ordinance caps a stand-alone shop on a vacant parcel at 4,500 square feet but caps nothing once a dwelling is there; the county will not take a residential plan set without an original South Carolina engineer's or architect's seal and wind design summary sheets; and more than half the county's mapped soil is rated poorly or very poorly drained, which makes the septic evaluation, not the slab, the thing that decides a parcel.
Building conditions in Horry County
The building code is the same in every South Carolina county: S.C. Code § 6-9-10(A) requires each municipality and county to enforce the Building Codes Council's codes and to enforce only those, and SC Regulation 8-236(C) bars a local jurisdiction from writing one of its own. The design numbers are not local either, but they are not one number for the state — Regulations 8-1202 and 8-1203 send wind and seismic to the Council's own map for this county, and those maps are drawn as contours, so the figure is read at your address rather than off a county name. What is genuinely local is who issues the permit and inspects the work, what that office charges, the permit procedure it adopted by ordinance, whether your parcel is zoned at all, and the rest of Table R301.2 — frost depth, termite probability and flood — which the jurisdiction fills in for itself.
SC Building Codes Council, Wind/Seismic Maps, https://llr.sc.gov/bcc/maps.aspx (page read 5 Sep 2026), and the Horry County sheet at https://llr.sc.gov/bcc/PDFfiles/WSMaps/Horry%20County.pdf — 10,372,422-byte application/pdf, one page, a single 10,166 × 10,867-pixel DeviceRGB DCTDecode image with no text layer; the image was extracted and read at native resolution 5 Sep 2026. Regulations 8-1202 and 8-1203, 2021 Code Modifications, S.C. State Register Vol. 46 Issue 5, 27 May 2022, https://llr.sc.gov/bcc/PDFfiles/2021-Code-Modifications.pdf ; SCBCC 2021 Modification Index, modifications IRC 2021-04 and IRC 2021-05, https://llr.sc.gov/bcc/PDFfiles/2021-Modification-index.pdf
2021 South Carolina Residential Code §§ R301.2.2, R301.2.2.6, R403.1.2, R403.1.3, read at https://up.codes/viewer/south_carolina/irc-2021/chapter/3/building-planning and https://up.codes/viewer/south_carolina/irc-2021/chapter/4/foundations, 5 Sep 2026 — a third-party rendering of the adopted South Carolina code; comparison counties from the Council's own sheets linked at https://llr.sc.gov/bcc/maps.aspx
Horry County Code Enforcement, "What you need for a Building Permit," https://www.horrycountysc.gov/departments/code-enforcement/permits/building-permit/what-you-need-for-a-building-permit/ (read 5 Sep 2026); the county's adopted-code notice, "2021 South Carolina Code Adoptions," https://www.horrycountysc.gov/media/hwwpypks/2021-south-carolina-code-adoptions.pdf
Horry County Zoning Ordinance (Appendix B to the Code of Ordinances) §§ 402, 919 (Ord. No. 123-2024, § 9, 10 Dec 2024) and Table 2-1, with the definition at Article XVII; county-published edition "UPDATED SEPTEMBER 1, 2026," https://www.horrycountysc.gov/media/i0pfcm2o/appendix-b-zoning-ordinance-upated-912026.pdf (15,737,803-byte PDF downloaded, text layer extracted and read 5 Sep 2026), linked from https://www.horrycountysc.gov/departments/planning-and-zoning/
S.C. Code § 48-39-10(B) and (J) and § 48-39-280(E), Coastal Tidelands and Wetlands Act, served text read at https://www.scstatehouse.gov/code/t48c039.php 5 Sep 2026; SCDES Coastal Zone Consistency Certification, https://des.sc.gov/programs/bureau-coastal-management/coastal-zone-consistency-certification ; SCDES stormwater, 1 to 2 Acres of Land Disturbance, https://des.sc.gov/programs/bureau-water/stormwater/stormwater-construction-activities/1-2-acres-land-disturbance
U.S. Census Bureau, Vintage 2025 county population estimates, co-est2025-alldata.csv, https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/totals/co-est2025-alldata.csv ; USDA NASS 2022 Census of Agriculture County Profile, Horry County, South Carolina, https://www.nass.usda.gov/Publications/AgCensus/2022/Online_Resources/County_Profiles/South_Carolina/cp45051.pdf (both fetched and read 5 Sep 2026)
Also worth knowing before you build in Horry County
- More than half the county's mapped soil is poorly or very poorly drained
- A query run against the USDA soil survey for Horry County (survey area SC051) returns, across the 721,803 acres the survey classifies by drainage, 257,920 acres rated poorly drained (35.7 percent) and 145,427 acres very poorly drained (20.1 percent) — 55.8 percent of the county between them — against 82,956 acres well drained, 11.5 percent. The dominant components tell the same story by name: Johnston 51,125 acres, Woodington 44,411, Pocomoke 38,889, Ogeechee 38,823, and the Leon spodosol at 36,614 acres, whose cemented spodic horizon perches water above it. On this ground the winter water table sits close to the surface, and two decisions follow from that rather than from the house design. The first is pad height: how much fill goes under the slab is the foundation decision on a flatwoods parcel, not a detail. The second is septic. S.C. Regulation 61-56 sets site suitability from soil morphology — texture, restrictive horizons and depth to the zone of saturation — not from a percolation test, and § 61-56.200.7 requires a usable repair area of at least 50 percent of the original system on soil proven suitable. The parcel has to hold the system, its full setback envelope and a proven reserve, all of it above the seasonal water table. Get the evaluation before you close.
- Zoned countywide since 17 April 2001 — and the FA district is where the acreage is
- Horry County's Planning and Zoning department states it flatly: "The entire county has been zoned as of April 17, 2001." There is no unzoned remainder to hope for. The district carrying the inland acreage is Forest Agriculture (FA), intended by the ordinance "for agriculture, forestry, and low-density: residential, commercial, social, cultural, recreational, and religious uses," with Limited Forest Agriculture (LFA) and Commercial Forest Agriculture (CFA) either side of it and Rural Estates (RE) for family farms. In FA, Table 2-1 sets a single-family dwelling at a minimum half acre (21,780 square feet), 40-foot front, 10-foot side, 15-foot rear, 15-foot corner side, 35-foot maximum height and 90 feet of lot width at the building setback line; a non-commercial personal use building takes a 60-foot front instead; an agricultural building for farm animals needs an acre and a half and a 60/25/40 envelope. Two more rules bite on rural parcels. Section 205.B.1, added by Ord. No. 24-2024, forbids any structure within 60 feet of the right-of-way of a named list of roads that covers most of the county's rural spine — Highways 19, 31 (Red Bluff Road), 57, 90, 319, 378, 701, 905, 917, Highway 9 Business, Highway 9 from the Marion County line to Highway 90, Nichols Highway, Hardwick Road off Highway 501 and Pee Dee Highway. And Section 404 requires at least 50 feet of frontage on a street for any newly created lot. A rezoning application runs $250 and the process takes 90 to 120 days.
- The permit is priced by the square foot, and it expires in six months
- Horry County does not price a residential permit off your contract. Its published schedule charges a plan review fee of twenty cents per square foot when plans are submitted, and, if the plans are approved, fifty cents per square foot when the permit is issued, with a minimum of fifty dollars plus a twenty-five dollar zoning fee. A plan revision is twenty-five dollars. A manufactured home permit is a flat one hundred fifty dollars plus zoning fees. Separately, no permit is valid at all without a certificate of zoning compliance: Section 106 of the zoning ordinance says no building or structure may be erected, moved, added to or structurally altered without one, and no building permit issued for construction in the ordinance's jurisdictional area is valid unless the Zoning Administrator has approved it. Section 109 then puts a clock on it — if the work described in a building permit has not begun within six months of issue, the permit expires and is cancelled. The Planning and Zoning counter is at 1301 Second Avenue, Conway.
- The beachfront baseline and setback line, how they are set, and how often they move
- If the parcel you are looking at is on the ocean side of Highway 17, a second regulator sits above the county. S.C. Code § 48-39-280 requires the department to establish a baseline that parallels the shoreline for each standard erosion zone and each inlet erosion zone; for a standard zone the baseline is "established at the location of the crest of the primary oceanfront sand dune in that zone." The setback line is then drawn landward of the baseline "a distance which is forty times the average annual erosion rate or not less than twenty feet from the baseline for each erosion zone." Both lines "must be established anew during establishment cycles that are not less than every seven years, but not more than every ten years following a previous establishment cycle," and until new lines are established for an area the existing ones apply. Two consequences a buyer feels directly. Under § 48-39-290(A) no new construction is allowed seaward of the baseline at all, bar a short list of walkways, small decks, piers and dune work. Between the baseline and the setback line, § 48-39-290(B)(1)(a)(i) allows a new habitable structure only if it "is no larger than five thousand square feet of heated space" and is "located as far landward on the property as practicable." And § 48-39-330 requires a contract of sale for property seaward of the setback line to carry a disclosure statement naming the lines and the local erosion rate. SCDES is currently running a phased re-establishment: a schedule was released 30 January 2024 for a review running between 2024 and 2028, with the first group of lines — Daufuskie, Hilton Head, Bay Point, St. Phillips, Little Capers, Pritchards, Fripp, Hunting and Harbor islands, all in Beaufort County — established and in effect as of 24 July 2026, and the greater Charleston and greater Edisto areas following in Phase II.
- South Carolina's karst is small, Coastal Plain, and one of its named pockets is in this county
- Sinkholes are a Blue Ridge and Valley-and-Ridge worry in most states; in South Carolina they are not, because the Upstate is crystalline rock that does not dissolve. What karst the State has is a limestone phenomenon of the middle and lower Coastal Plain, mapped in a handful of discrete places on SCDNR's Geologic Hazards of the South Carolina Coastal Plain — and one of them is here. The map's reference list cites Hockensmith, B.L., and Pelletier, A.M., 1987, "Investigation of sinkhole occurrences at Goretown, near Loris, South Carolina," South Carolina Water Resources Commission Open-File Report 11, 31 p. Goretown is a Horry County place, a few miles from Loris, in exactly the part of the county where the inland acreage is. The hazard sheet's legend carries the categories Potential for Collapse, Potential for Sinkholes, Known Sinkhole Occurrences and Limestone Cave, and it prints a photograph captioned as a cover-collapse sinkhole in Horry County. Read the map's own limits before anyone quotes it at you: SCDNR states the information "should not be used for land-use zoning, building-code requirements, or defining insurance rate zones," and that hazard potential "should be evaluated through site-specific geotechnical investigation by qualified practitioners." It screens a parcel around Loris and Green Sea; it does not decide one. What decides one is a walk for closed depressions and, if anything flags, a geotechnical investigation before the slab is designed.
- A barndominium is never a farm structure in South Carolina — and the ordinance keeps the two apart
- S.C. Code § 6-9-65(A) defines a farm structure as one constructed on a farm "other than a residence or a structure attached to it," and adds that the term "does not include a structure originally qualifying as a 'farm structure' but later converted to another use." A barndominium is a residence, so it is outside the exemption from day one; the shop half of a shouse is outside it too, because it is attached to a residence; and putting up a pole barn under the exemption and finishing it into living space later pulls the whole building back under the code. § 6-9-65(C) also makes the exemption conditional on filing an affidavit with the local building official before construction, stating the purpose and intended use — it is not automatic. Horry County's zoning ordinance draws the same line from the land-use side without pretending it is a code exemption: Section 108 lets genuinely agricultural accessory structures — greenhouses, open sheds, tobacco and bulk barns, packhouses, electric water pump sheds "used in connection with a bona fide agriculture use" in the LFA, FA, CFA and AG districts — be shown on a plan without being drawn to scale, while still requiring them to meet the district's exterior setbacks. That is a drafting concession about site plans, in a zoning ordinance. It is not permission to live in the building.
USDA-NRCS Soil Data Access, survey area SC051 (Horry County, South Carolina), tabular query posted to https://SDMDataAccess.sc.egov.usda.gov/Tabular/post.rest 5 Sep 2026, aggregating component drainage class and component acreage by map unit; S.C. Regulation 61-56, Onsite Wastewater Systems, §§ 61-56.102, 61-56.200, https://des.sc.gov/sites/des/files/Library/Regulations/R.61-56.pdf ; SCDES Professional Soil Classifiers, https://des.sc.gov/permits-regulations/septic-tanks/professional-soil-classifiers
Horry County Current Planning & Zoning, https://www.horrycountysc.gov/departments/planning-and-zoning/current-planning-zoning/ (read 5 Sep 2026); Horry County Zoning Ordinance §§ 205.B.1 (Ord. No. 24-2024, § 2, 1 Apr 2024), 404, Article II district intents and Table 2-1, https://www.horrycountysc.gov/media/i0pfcm2o/appendix-b-zoning-ordinance-upated-912026.pdf
Horry County Code Enforcement, "Cost of a Building Permit," https://www.horrycountysc.gov/departments/code-enforcement/permits/building-permit/cost-of-a-building-permit/ (read 5 Sep 2026); Horry County Zoning Ordinance §§ 106, 109, https://www.horrycountysc.gov/media/i0pfcm2o/appendix-b-zoning-ordinance-upated-912026.pdf ; department address from https://www.horrycountysc.gov/departments/planning-and-zoning/current-planning-zoning/
S.C. Code §§ 48-39-280, 48-39-290 and 48-39-330, served text read at https://www.scstatehouse.gov/code/t48c039.php 5 Sep 2026; SCDES Bureau of Coastal Management, State Beachfront Jurisdictional Lines, https://des.sc.gov/programs/bureau-coastal-management/beachfront-management/state-beachfront-jurisdictional-lines (page HTML fetched and the review-schedule section read 5 Sep 2026)
SCDNR Geological Survey, Geologic Hazards page and its reference list naming Hockensmith and Pelletier (1987), https://www.dnr.sc.gov/geology/geologic-hazards.html (read 5 Sep 2026 — the linked Open-File Report 11 PDF at hydrology.dnr.sc.gov returns 404); SCDNR Geological Survey and SC Emergency Management Division, General Geologic Map Series 5, Geologic Hazards of the South Carolina Coastal Plain, 2012, 1:600,000, https://www.dnr.sc.gov/geology/pdfs/GGMS5.pdf
S.C. Code § 6-9-65, served in full at https://www.scstatehouse.gov/code/t06c009.php (read 5 Sep 2026); Horry County Zoning Ordinance § 108, https://www.horrycountysc.gov/media/i0pfcm2o/appendix-b-zoning-ordinance-upated-912026.pdf
The expensive surprises are in the ground, not the building
What moves a South Carolina budget is usually below grade, and more often than not it is the drainfield rather than the foundation. R.61-56 § 200.1 settles whether a parcel can take an onsite system from soil morphology — texture, structure, depth to a restrictive horizon and depth to the zone of saturation — and § 200.2 then rules out two conditions outright: soils exhibiting massive or platy structure, and soils with substantial amounts of expansible layer clay minerals or smectites. That second clause is the one that bites on the mafic Piedmont, where the shrink-swell series sit in quantity under York, Fairfield, Chester, Laurens, Union, Newberry, Greenwood, McCormick, Lancaster, Saluda, Abbeville and Edgefield. A foundation problem has a price and an answer; an unbuildable septic parcel has neither, which is why we look at it first. Bedroom count is the number to settle early, because § 61-56.501 drives design flow from bedrooms, design flow drives trench length, and trench length plus a repair area decides how much good soil the parcel has to have — shop square footage adds nothing to it. Above the Fall Line the evaluation is done in backhoe pits rather than borings alone, so the answer comes from a dug hole and not a form. The site work, the foundation and the drainfield therefore get resolved together rather than one at a time. We price the dirt before we price the building.
What we build in Horry County
All nine services are available in Horry County. What a build costs depends far more on the parcel than on square footage, so we price against your land rather than publishing a rate card.
Custom Plans
Barndominium plans drawn for your parcel and sealed at the point where South Carolina’s engineering exemption stops applying.
Barndominium Kits
Engineered shell packages for South Carolina land — open construction under the state’s own definition, and therefore not a modular building.
Turnkey Builds
Barndominium construction from raw land through to occupancy: one contract, one schedule, one party answering the building official.
What a build looks like
Three stages every Horry County project passes through, from a raw parcel to a finished home. Site work first, because that is where the budget is decided.
The parcel
Zoning, setbacks, flood zone and utility access get checked before anything is drawn.
Pad and permit
Clearing, grading and a compacted pad, while the submittal works through whichever office issues the permit where you are building.
Frame to finish
Shell erected and dried in, then systems, insulation and interior finish through to CO.
Those are the rules where you are building in Horry County. Tell us what you want to build and we will draw it to them.
Keep reading
The questions that usually come next once you know what Horry County allows.
Nearby areas we build in
Others we cover nearby. One may be a county and another a municipality inside one — and a South Carolina municipality can sit in two counties at once — so the office that issues the permit, the fees it charges, whether the land is zoned at all, and which design map covers it can all differ from one card to the next.
Building in Horry County: common questions
10 questions we get asked most often about building in Horry County. If yours is not on the list, ask it directly.
I'm moving to Myrtle Beach from out of state. Where do I actually buy the land?
What design wind speed applies to my parcel in Horry County?
Does the Charleston earthquake code apply to me here?
Can the shop be bigger than the house? And can I put the shop up first?
Horry is listed as a coastal county. Do I need an OCRM permit for a build near Conway?
I'm looking at oceanfront or second-row land. What do the baseline and the setback line actually do?
Will my land take a septic system? What decides it?
Someone mentioned sinkholes near Loris. Is that a real thing in South Carolina?
What does the county need from me, and what does the permit cost?
Can I build it as a farm building and skip the residential code?
Building in Horry County?
Start with the plan. Tell us what you want to build and we will draw it, then confirm which office issues the permit for your parcel, what it will let you put there, and what wind load it has to meet. That conversation costs nothing.